Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:N4008020R0026
Joint Base Anacostia-Bolling (JBAB) Storm Water Best Management Practices (BMPs) require reparation and restoration to effectively treat storm water as was originally designed in order to meet the reg...
Joint Base Anacostia-Bolling (JBAB) Storm Water Best Management Practices (BMPs) require reparation and restoration to effectively treat storm water as was originally designed in order to meet the regulations of the Clean Water Act. The purpose of this project is to restore and maintain Stormwater Best Management Practices at JBAB which include StormFilter chambers and settling chambers at BMP ID # JBAB047 (Bldg. 54), JBAB053 (Bldg. 3620), and JBAB054 (Bldg. 3610) (1 to 4 chambers per site) and Filterra Tree Box Structures at BMP ID # JBAB004 (Bldg B91), JBAB032 (Bldg B92), JBAB034 (Bldg 6126), JBA000113 (Bldg 4472), JBA000114 (Bldg 4514), JBAB134 (Bldg 6126), and JBAB232 (Bldg 352). Site Visit: 10:30 am, 12 June 2020 (Please submit the site visit request form to hyesuk.c.konecne@navy.mil) Joint Anacostia Bolling Base, Washington, D.C., by firm fixed-price.