Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:N40080-21-R-1827
This project will remove and upgrade existing aging and deteriorated domestic water supply infrastructure servicing the Installation and river water supply infrastructure servicing the Trident Missile...
This project will remove and upgrade existing aging and deteriorated domestic water supply infrastructure servicing the Installation and river water supply infrastructure servicing the Trident Missile Fuel, Rocket Motor Extrusion, Torpedo Fuel/Agile Chemical, Propellant Pilot, and Moser Liquid Fuel plant sites located on the restricted side of the Installation. Approximately 113,991 LF of the existing potable water (PW) distribution system, fittings and associated connections need to be removed and upgraded and including new hydrants. Linear footage of potable water piping by project is approximately: P234 –South 47,188 LF, P232 – Central 31,641 LF, P233 – North 30,533 LF. Approximately 35,857 LF of the existing river water (RW) distribution system, fittings and associated connections need to be removed and upgraded. The river water supply system is located throughout the Installation and serves mission critical industrial processes because it services the fire suppression system at the installation.