Inactive
Notice ID:N3319124R0014
***Notice to Offerors --- SAM.Gov Solicitation # N3319124R0014 corresponds to PIEE Solicitation # N3319124RS0014. Please submit your proposals in PIEE under Solicitation # N3319124RS0014*** https://pi...
***Notice to Offerors --- SAM.Gov Solicitation # N3319124R0014 corresponds to PIEE Solicitation # N3319124RS0014. Please submit your proposals in PIEE under Solicitation # N3319124RS0014*** https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N3319124RS014 ***Amendment A0002 to Solicitation N3319124R0014 has been posted to PIEE. The purpose of this Amendment is to replace Defense Federal Acquisition Regulation Supplement (DFARS) 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting w ith 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting (DEVIATION 2024-O0013 REVISION 1).*** ***Amendment 0001 to Solictation N3319124R0014 has been posted to PIEE. The reason for this Amendment is to provided the Government's responses to the 41 PPIs received. **** ***The Pre-proposal Powerpoint presentation and the Attendance Roster have been uploaded in PIEE under under Solicitation # N3319124RS0014*** This project will repair electrical distribution substations at NSA Souda Bay, Crete, Greece. It includes six (6) substations (SS2, SS4, SS5, SS6, SS7 and SS9) and one (1) Medium Voltage (MV) switchgear (SS7A) which are approaching the end of their service life. Substation equipment and electrical items to include but not limited to existing substation ring main units (RMUs), transformers secondary circuit breaker cabinet combination and substation cabling shall be replaced. New dry-type transformers, Medium Voltage (MV) & Low Voltage (LV) switches, outdoor enclosures, Capacitor Bank, Advanced Metering Infrastructure (AMI) meters, reconfiguration of existing AMI meters, grounding, protective relaying, other electrical items and civil work are required for complete and usable substations. Award will be made in U.S. Dollars. In accordance with DFARS 236.204, the magnitude of construction for this project is between $1,000,000 and $5,000,000.