Inactive
Notice ID:N33191-20-R-0658
The intent of this project is to make permanent repairs to the various storm water facilities and their respective support infrastructure, that was damaged by November 2019 Storm and to incorporate su...
The intent of this project is to make permanent repairs to the various storm water facilities and their respective support infrastructure, that was damaged by November 2019 Storm and to incorporate sustainable repairs to the various stormwater facilities at the camp. The intent of the design is to also prevent future stormwater infrastructure failures and alleviate camp flooding.