The objective of this project is to: 1. Replace the existing scullery equipment at east and west dishwashing rooms of Dorie Miller Galley. 2. Replace existing drywall with green board. All walls insid...
The objective of this project is to: 1. Replace the existing scullery equipment at east and west dishwashing rooms of Dorie Miller Galley. 2. Replace existing drywall with green board. All walls inside east and west dishwashing room will be replaced. Existing studs will be used to install the green board replacement. Demolition of drywall and installation of green board will comply in accordance with UFGS Division 09 Section 09 29 00 Gypsum Board. 3. Install stainless steel backsplash sheet panels along the east and west walls in both dishwashing rooms to further provide a sanitary working surface. Backsplash sheet panel will comply in accordance with UFGS Division 12 Section 12 36 00, Countertops. The work location is at Bldg 310, Dory Miller Galley, Camp Lemonnier, Djibouti