USNS LEROY GRUMMAN (T-AO 195) FY27 ROH/DD
The Military Sealift Command requires a Regular Overhaul and Dry Docking (ROH/DD) for the USNS LEROY GRUMMAN (T-AO 195), to be performed on the East Coast or Gulf Coast. Major work includes tank cleaning, preservation, structural repairs, dry docking, and underwater hull maintenance. No specific budget amount or submission timeline is provided in the description. The location for performance is specified as the East Coast or Gulf Coast. This opportunity is for a vessel overhaul with significant industrial shipyard work.