Inactive
Notice ID:N3220524Q2118
The USNS CARSON CITY (EPF-7) requires the Original Equipment Manufacturer (OEM), Hose-McCann, to inspect, repair or replace the Shipboard Manually Operated Alarm, EPIC System, and Interior Communicati...
The USNS CARSON CITY (EPF-7) requires the Original Equipment Manufacturer (OEM), Hose-McCann, to inspect, repair or replace the Shipboard Manually Operated Alarm, EPIC System, and Interior Communications Systems (JICS) throughout the vessel. The period of performance is September 15 – 30, 2024. See attached SOW and Sole Source Memo.