Inactive
Notice ID:N3220520Q0120
Provide all labor, equipment, and services to replace the existing alarm windows, analog circuits, software and infrastructure and install the T-AO 187 Class automation upgrade known as ‘Phase II’. Pr...
Provide all labor, equipment, and services to replace the existing alarm windows, analog circuits, software and infrastructure and install the T-AO 187 Class automation upgrade known as ‘Phase II’. Provide all labor, equipment and services of a Service Engineer to test all the Main Engine automation and control system operations for the Port and Stbd Main Engines, support annual inspection requirements for ABS, and make adjustments to control parameters for optimal engine performance and power distribution. The Period of Performance is as follows in Singapore: Phase II: 22 APR – 1 MAY 2020 Ten - (10) Days Groom: 2 MAY – 20 MAY 2020 Eighteen (18) Days