Replace the existing HVACs in buildings 1582, 2093 and 2188, and Install two Mini Split systems in buildings 201 and 2806
N00421-19-Q-0500
Provide all material, equipment, labor, and supervision to replace the existing HVACs in buildings 1582, 2093 and 2188, and Install two Mini Split systems in buildings 201 and 2806.