48--HIGH STAGE PRECOOLE, IN REPAIR/MODIFICATION OF
The Navy requires repair/overhaul, testing, inspection, and return to Ready-for-Issue condition of the HIGH STAGE PRECOOLE (P/N 3214446-4; NSN 7RH 4820 015766252 F7), with the contractor supplying facilities, labor, materials, parts, and test/tooling unless Government-furnished. Repairs must be performed at the identified Honeywell International, Engine Systems & Accessories facility at 1300 W Warner Road Ste 1201-1207 (Cage 59364), under ISO 9001/SAE AS9100 quality, configuration-management, MIL-STD-130 marking, and MIL-STD-2073 packaging requirements. The required repair turnaround time is 77 days after receipt of asset, induction expires 365 days after contract award, and the contractor must propose a monthly throughput constraint; early and incremental deliveries are accepted and preferred. The contractor must also maintain quality documentation, purchased-parts controls, and handling for BER, MOI, OAR, and nonconforming material per the SOW. A 12-month warranty applies, measured 60 days after discovery of defect.