61--CONTROLLER,ELECTRIC, IN REPAIR/MODIFICATION OF
NAVSUP WSS requires repair/overhaul, upgrade, test, and inspection of Electric Controller NSN 6110-01-703-0671, P/N 2056AS4000-G05, restored to Ready for Issue condition per the latest manuals, drawings, specifications, and engineering orders, with the contractor supplying facilities, labor, materials, parts, tooling, and test equipment. The item is a Critical Safety Item for a shipboard aircraft launch/recovery system, so ISO 9001/AS9100 quality, calibration, configuration management, MIL-STD-130 marking, source/lot inspection, and NAWCADLKE/DCMA QA surveillance apply, including interim inspection and contractor assistance. Required repair turnaround time is 550 days after receipt of asset, induction expires 365 days after contract award, early/incremental deliveries are preferred, and the contractor must provide a monthly throughput constraint. Repair performance is identified at Northrop Grumman Systems Corporation, 7301 Sykesville Rd, Sykesville, MD 21784-7404, with a pre-award survey and post-award conference possible for new manufacturers. Government inspection/acceptance and interim QA surveillance require advance notice of at least 14 working days and 7 working days respectively, and the warranty of supplies is 12 months or 60 days after discovery of defect.