59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
The Navy requires repair, overhaul/upgrade, testing, inspection, and acceptance of Circuit Card Assemblies (P/N 8527450-901; NSN 5998-01-530-4069 / 7RH 5998 015304069 V2) to Ready for Issue condition, with the contractor responsible for facilities, labor, materials, parts, and tooling unless Government-furnished. Repairs must be performed at the facility identified in the SOW; Honeywell International Inc. at 21333 N. 19th Ave., Phoenix, AZ 85027-2764 is listed as the repair source/location. The required repair turnaround time is 121 days after receipt of the asset, and the contractor must provide a throughput constraint for each NSN. The contractor must maintain ISO 9001/SAE AS9100 or equivalent quality, calibration, configuration management, receiving inspection, nonconforming-material, and data-record controls, and comply with MIL-STD-130 marking and MIL-STD-2073 packaging requirements. Use of MIL-W-81381 wire is prohibited; SAE-AS22759 series wire must be used where cited.