POWER SUPPLY
This is a Navy requirement for repair of the listed items, with contractual delivery measured as repair turnaround time from physical receipt of the F-condition asset at the contractor’s facility to Government acceptance. The contractor must report receipt transactions in the commercial Asset Visibility system by the end of the fifth regular business day and ensure the CAV Action Date reflects actual physical receipt. The contractor must meet the required RTAT established in the subsequent contract, provide a throughput constraint for each NSN, and accept consideration/negotiation if RTAT requirements are not met; a reconciliation modification will follow final inspection and acceptance of all inducted assets. Assets may be inducted only until 365 days after contract award, after which repair requires bilateral agreement with the NAVSUP WSS Contracting Officer.