28--BLADE SET,FAN,AIRCR, IN REPAIR/MODIFICATION OF
The Navy requires contractor repair and overhaul of aircraft fan blade sets to return them to Ready-for-Issue condition, including inspection, component repair/replacement, reassembly, and testing per applicable manuals and specifications. Performance is specified at General Electric Company’s facility in Cincinnati, Ohio (CAGE 07482), and the contractor must supply all necessary parts and materials. A required repair turnaround time (RTAT) of 90 days after asset receipt applies, and assets received more than 365 days after contract award would not be authorized for repair without bilateral agreement. The contractor must maintain an ISO 9001/SAE AS9100 quality program, meet calibration standards, and follow