16--GENERATOR,VARIABLE, IN REPAIR/MODIFICATION OF
U.S. Navy repair requirement for variable generators (P/N 7RH 1680 016578001) to return units to Ready-for-Issue condition, with work performed at Honeywell International Inc., 11100 N Oracle Road, Tucson, AZ. The required Repair Turnaround Time (RTAT) is 118 days from physical receipt of the asset at the contractor’s facility to Government acceptance, with an induction expiration date of 365 days after contract award. The contractor must supply all labor, materials, parts, and test equipment, and maintain an ISO 9001/AS9100-compliant quality system with calibration per ANSI/NCSL Z540.3; MIL-W-81381 wire is prohibited and SAE-AS22759 wire must be used instead. Special procedures require Government concurrence for beyond economic repair, over-and-above repair, and missing-on-