16--MOTOR CONTROLLER OB, IN REPAIR/MODIFICATION OF
The opportunity is for repair/overhaul/upgrade, testing, and inspection of a MOTOR CONTROLLER, NSN 7RH 1680 015854988 P8, P/N 2715320-2-1, in accordance with Honeywell Intl Inc. drawing 70210 2715320-2-1 and referenced specifications. Performance is tied to Honeywell Intl Inc. at 2525 W 190th Street, Torrance, CA 90504-6002, and the contractor must perform repairs/upgrades at the facility identified in the SOW. The required repair turnaround time is 221 days after receipt of asset, with an induction expiration date of 365 days after contract award date and a throughput constraint to be provided per NSN. The contractor must supply all facilities, labor, materials, parts, test and tooling equipment unless expressly Government-furnished, and maintain an ISO 9001/SAE AS9100 quality system and compliant calibration system. A 12-month warranty applies with a 60-day defect discovery reporting period, and BER, MOI, OAR, and configuration/repair-source changes require DCMA/PCO verification or approval.