28--POWER UNIT,GAS TURB, IN REPAIR/MODIFICATION OF
The effort is a commercial-item repair/overhaul/upgrade of a gas turbine power unit (P/N 3800702-1, NSN 7RH 2835 015733495 P8) per Honeywell drawing 99193 3800702-1, latest revision, returning units to Ready for Issue condition. The identified repair source/location is Honeywell Intl in Phoenix, AZ, and the contractor must provide facilities, labor, materials, parts, and test/tooling unless Government Furnished Material/Property is expressly provided; cannibalization and non-new material require PCO approval. Required repair turnaround time is 34 days after receipt of the asset, and the induction expiration date is 365 days after contract award, with reconciliation after final inspection and acceptance. The contractor must provide a throughput constraint for each NSN and a monthly repair quantity after initial delivery begins; BER, MOI, and OAR determinations require DCMA concurrence and PCO direction and may be outside the contract price. Quality requirements include ISO 9001/SAE AS9100, calibration, configuration management, MIL-STD-130 marking, MIL-STD-2073 packaging, and a 12-month warranty with defects reported within 60 days of discovery; early and incremental deliveries are preferred.