59--SSE,AIRCRAFT,MATERI, IN REPAIR/MODIFICATION OF
This is an amendment to a repair requirement for SSE, Aircraft, Mater (P/N 174862-02-01; NSN 1680-01-567-3889), increasing the quantity to 30 EA and requiring overhaul/repair, testing, inspection, and return to Ready for Issue condition under a Basic Ordering Agreement. The contractor must perform work at the identified repair source, GE Aviation Systems LLC, 3290 Patterson Ave SE, Grand Rapids, MI 49512-1991, and provide the facility, labor, materials, parts, and test/tooling unless Government Furnished Property is expressly provided. Required repair turnaround time is 183 days after receipt of the asset; the induction expiration date is 365 days after contract award, and the warranty is 365 days after delivery of the unit with defects to be addressed within 45 days of discovery. The contractor must establish throughput constraints per NSN, maintain ISO 9001/SAE AS9100 quality and calibration systems, and comply with configuration management, packaging, and material controls; MIL-W-81381 wire is prohibited and SAE-AS22759 series wire must be used instead. Early and incremental deliveries are accepted, and contractual documents are considered issued upon mailing, fax, or electronic transmission.