CIRCUIT CARD ASSEMB
This requirement is for the repair of specific items, with performance measured by Repair Turnaround Time (RTAT) from asset receipt at the contractor's facility to government acceptance. The contractor must meet the established RTAT and provide a monthly throughput constraint for each National Stock Number (NSN). Assets may be inducted for repair up to 365 days after contract award, with no further induction authorized beyond that date without bilateral agreement. Pricing is based on the negotiated RTAT, and failure to meet RTAT requirements may result in consideration assessment and negotiation. The location for performance of services is not specified in the description.