58--V/UHF AIU EXTENDED, IN REPAIR/MODIFICATION OF
The Navy requires repair/overhaul, upgrade, testing, inspection, and return-to-Ready-for-Issue of V/UHF AIU EXTENDED units (P/N 86400-1; NSN 5895-01-630-0207) in accordance with Pole/Zero Acquisition Inc. drawings and repair manuals. The contractor must furnish all facilities, labor, materials, parts, and test/tooling unless Government-furnished property is expressly identified, with work performed at the specified repair source/location: Pole/Zero Acquisition Inc., 5558 Union Centre Drive, West Chester, OH 45069-4821. Required turnaround time is 44 days after receipt of each asset, with a contractor-provided monthly throughput constraint after initial delivery and an induction expiration date 365 days after contract award; early and incremental deliveries are accepted/preferred. The contractor must maintain an ISO 9001/SAE AS9100 quality system, an acceptable calibration system, configuration management, and comply with MIL-STD-130 marking and MIL-STD-2073 packaging requirements. Special provisions address Beyond Economical Repair, Missing on Induction, Over and Above Repair, and require PCO/DCMA approvals or concurrences for certain repairs, deviations, or source changes.