ARS ACTUATOR
This opportunity is for the repair and overhaul of the ARS Actuator (P/N 8090201912-100) to return units to Ready for Issue condition, with the contractor responsible for all parts, materials, tooling, and repair manuals. Performance must comply with Boeing drawing 8090201912-100 and applicable specifications, with work performed at the facility identified in the SOW (referenced as Boeing in Seattle, WA). The required Repair Turnaround Time is 119 days after asset receipt, and assets must be inducted within 365 days after contract award; monthly throughput constraints apply. The contract includes quality requirements under ISO/AS9100 and configuration management, with special procedures for Beyond Economical Repair, Missing on Induction, and Over and Above Repair items.