16--CYLINDER ASSEMBLY,A, IN REPAIR/MODIFICATION OF
The Navy requires repair of designated assets/NSNs under a purchase-order-type effort, with contractor reporting of receipts and transactions through the Commercial Asset Visibility (CAV) system. The required repair turnaround time is 35 days after receipt of the F-condition asset at the contractor’s facility, and the contractor must provide a monthly throughput constraint after initial deliveries begin. Induction expires 365 days after contract award, and assets received after that date are not authorized for repair without bilateral agreement with NAVSUP WSS. A reconciliation modification will be issued after final inspection and acceptance of all inducted assets, with negotiated unit prices tied to meeting RTAT requirements and consideration assessed if RTATs are missed. Supplies carry a 12-month warranty after acceptance or 60 days after discovery of defect, and early/incremental deliveries are accepted and preferred.