16--BOOSTER ASSEMBLY,AI, IN REPAIR/MODIFICATION OF
This Navy requirement is for overhaul, upgrade, repair, testing, inspection, and acceptance of Booster Assembly, AI (P/N 340-001-320-0; NSN 1680016997330) to Ready for Issue condition. The contractor must supply the facility, labor, materials, parts, test/tooling equipment, and maintain quality, calibration, configuration management, marking, and packaging controls, using ISO 9001/SAE AS9100 and applicable MIL-STD requirements. Required repair turnaround time is 170 days after receipt of asset, induction expires 365 days after contract award, and warranty coverage is 12 months with defects reported within 60 days after discovery. Repairs/upgrades must be performed at the facility identified in the SOW, listed as General Electric, 201 W Crescentville Rd, Cincinnati, OH 42246. Items determined Beyond Economical Repair, Missing on Induction, or Over and Above Repair require DCMA/PCO coordination and may be excluded from or adjusted outside the contract price.