70--SERVER,AUTOMATIC DA, IN REPAIR/MODIFICATION OF
This is a Navy contract for repair of ALRE non-critical items, with performance at the contractor's facility. The required repair turnaround time is 110 days after receipt of the asset, and early/incremental deliveries are accepted. Assets must be inducted within 365 days after contract award, and the contractor must provide a monthly throughput constraint. A 12-month warranty applies, with defect notification required within 60 days after discovery. Reconciliation of pricing will occur after final inspection and acceptance, with consideration assessed if the repair turnaround time is not met.