59--SWITCH,PROXIMITY, IN REPAIR/MODIFICATION OF
This opportunity is for the repair of flight-critical, ALRE Critical Safety Items (CSI) used in aircraft launch and recovery systems, requiring engineering source approval from the Naval Air Systems Command. The required Repair Turnaround Time (RTAT) is 110 days after receipt of asset, with an induction expiration date of 365 days after contract award. Performance of services is not explicitly tied to a single location, but the contractor must support on-site inspections by NAWCADLKE representatives from Lakehurst, NJ. No specific budget amount is provided. The contract includes stringent quality, inspection, and record-keeping requirements, with a 12-month warranty and a pre-award survey likely required for new manufacturers.
Links (1)
Attachments (17)
Data sourced from SAM.gov.
View Official Posting »