61--DISTRIBUTION BOX, IN REPAIR/MODIFICATION OF
This is a contract for the repair, overhaul, and testing of Distribution Boxes with specific NSN and part numbers to return them to a Ready for Issue condition. The contractor must perform all work at their own facility in Saint-Jean-sur-Richelieu, Quebec, Canada, and is responsible for all labor, materials, parts, and equipment. A key requirement is a Repair Turnaround Time (RTAT) of 110 days from physical receipt of an asset at the contractor's facility to its final acceptance, with an induction period expiring 365 days after contract award. The contractor must also establish a monthly throughput capacity and maintain a quality system conforming to ISO 9001/AS9100.