16--JUNCTION BOX,AIRCRA, IN REPAIR/MODIFICATION OF
The Navy requires repair, testing, inspection, and return to Ready for Issue condition of 3 units of NSN 1680-01-494-9173, Junction Box, Aircraft, P/N 30223-0101, with contractor-provided facilities, labor, materials, parts, and tooling unless expressly Government furnished. The induction period for initial units is 365 calendar days from contract award, with the Government able to extend by an additional 365 days for a total of two years, and unused first-year induction slots may carry over. The contractor must propose option pricing for a maximum of 10 units over the entire contract period inclusive of the initial quantity, with separate second-year pricing if pricing changes after the first 365 days. Work is to be performed at the contractor’s facility identified in the SOW, specifically Simmons Precision Products, 100 Penton Road, Vergennes, VT 05491. The contractor must maintain ISO 9001/SAE AS9100 quality, calibration, configuration management, and storage capabilities, and Government Furnished Property is not provided unless expressly stated.