16--NRP,CCA,SUPPLY,POWE, IN REPAIR/MODIFICATION OF
The Navy requires repair/overhaul, upgrade, testing, and inspection of NRP, CCA, SUPPLY, POWE components (P/N 7R 1680-016460636) to return them to Ready for Issue condition, with contractor responsibility for labor, parts, materials, tooling, test equipment, and quality/configuration management. Work is to be performed at the contractor’s facility, with the repair source/location identified as Simmonds Precision Products DBA Goodrich Fuel & Utility Systems, 100 Panton Rd., Vergennes, VT 05491. The contractor must comply with ISO 9001/SAE AS9100, MIL-I-45208A/MIL-Q-9858 or equivalent, calibration standards, and maintain inspection records for at least 12 months after acceptance. Repairs must follow approved drawings, specifications, and manuals—Government manuals/drawings will not be provided—with special handling for Beyond Economical Repair, Missing on Induction, Over and Above Repair, and nonconforming material; cannibalization is not authorized unless specifically approved. A one-year warranty after delivery applies, defects must be reported within 45 days after discovery, and the Government may randomly select completed CLINs quarterly for repair assessment testing.