16--COOLANT PUMP ASSEMB, IN REPAIR/MODIFICATION OF
This Navy repair requirement seeks repair of one coolant pump assembly (NSN 1680-01-561-2391, P/N 2780826-1), with firm-fixed-price pricing if determinable. Repairs must return the item to Ready for Issue condition per the latest applicable repair technical publications and require ISO 9001/SAE AS9100-level quality, inspection, records, and configuration management. Required repair turnaround time is 709 days after receipt of asset, induction expires 365 days after contract award, and a throughput constraint must be provided; warranty is 12 months/60 days after defect discovery. The repair source/location is Northrop Grumman Systems Corp D/B/A Integrated Systems, 2000 W NASA Blvd, Melbourne, FL 32904-2322, and work must be performed at the facility identified in the SOW. The contractor supplies all parts/materials unless government-furnished, early/incremental deliveries are preferred, and consideration may be assessed if RTAT is not met.