16--NRP,CONTROL PANEL C, IN REPAIR/MODIFICATION OF
This RFQ covers the repair of 5 each of NSN 1680 016102356 (Control Panel C, P/N 123AV53349-7) to a Ready for Issue (RFI) condition. The required repair turnaround time (RTAT) is 197 days after receipt of asset, with an induction expiration date of 365 days after contract award. Performance will occur at Northrop Grumman, 2000 W NASA Blvd, Melbourne, FL 32904-2322, and the contractor must supply all parts, materials, tooling, and facilities. The contract imposes quality system, calibration, configuration management, and marking requirements, along with a 12-month warranty, and early/incremental deliveries are accepted. A firm fixed price is sought, and offerors who cannot determine a FFP should notify the PCO.