16--SERVOVALVE ASSEMBLY, IN REPAIR/MODIFICATION OF
This is a contract for the repair of assets, with a required Repair Turnaround Time (RTAT) of 90 days from physical receipt at the contractor's facility. The contractor must provide a monthly throughput capacity and all assets must be inducted for repair within 365 days of the contract award date. Final inspection and acceptance of all repaired assets is required by the Government.