16--SERVOVALVE ASSEMBLY, IN REPAIR/MODIFICATION OF
This is a contract for the repair of assets, with a required Repair Turnaround Time (RTAT) of 90 days from physical receipt at the contractor's facility. The contractor must provide a monthly throughput constraint for each part number. An Induction Expiration Date is set for 365 days after contract award, after which no further assets can be accepted for repair without a bilateral agreement. The performance location is not specified. No budget information is provided.