16--MANIFOLD ASSEMBLY,H, IN REPAIR/MODIFICATION OF
The effort covers repair, test, inspection, and return to Ready-for-Issue condition of the MANIFOLD ASSEMBLY,H (P/N 3920032-104, NSN 014803449, latest revision) in accordance with the SOW and technical publications. Required repair turnaround time is 28 days after receipt of the asset, and the contractor must propose a monthly throughput constraint. Repairs must be performed at the facility identified in the SOW; the listed repair source/location is Parker Hannifin, 14300 Alton Pkwy, Irvine, CA 92618. The contractor is responsible for facilities, labor, materials, parts, test/tooling, and any non-Government-furnished property, with Government approval required for repair deviations, source/facility changes, cannibalization, and certain BER/MOI/OAR determinations. The contractor must maintain ISO 9001/SAE AS9100 quality, calibration, configuration management, marking, storage, and MIL-STD 2073 packaging as applicable.