66--DISPLAY,MULTIPLE, IN REPAIR/MODIFICATION OF
This opportunity is for the repair and overhaul of a DISPLAY, MULTIPLE item (NSN 6610 016999434) to a Ready for Issue (RFI) condition, with a required Repair Turnaround Time (RTAT) of 110 days after receipt of the asset. The contractor must provide all necessary facilities, labor, materials, and tooling, as no Government Furnished Property will be provided, and work must be performed at the specified facility in Gulf Breeze, FL. The contractor is responsible for a quality system compliant with ISO 9001/SAE AS9100 and must maintain a calibration system meeting ANSI/NCSL Z540.3. Items are considered Beyond Economical Repair (BER) if repair costs exceed 75% of the replacement price, and such determinations require written DCMA concurrence and PCO disposition instructions. The contractor must also follow specific procedures for Missing on Induction (MOI) and Over and Above Repair (OAR) items, which are not included in the base contract price.