66--INERTIAL NAVIGATION, IN REPAIR/MODIFICATION OF
This U.S. Navy effort covers repair, upgrade, overhaul, testing, inspection, and acceptance of Inertial Navigation units to Ready for Issue condition, with the contractor responsible for facilities, labor, materials, parts, and test/tooling unless Government-furnished. Required repair turnaround time is 90 days after receipt of the asset, and induction expires 365 days after contract award; the contractor must also provide a monthly throughput constraint per NSN. Repairs/upgrades must be performed at the specified facility: Honeywell International Inc., DSES Clearwater Defense Division, 13350 US Highway 19 North, Clearwater, FL 33764. The contractor must maintain an ISO 9001/SAE AS9100 quality system, calibration program, configuration management plan, and comply with detailed inspection, material control, failure analysis, nonconforming material, BER/MOI/OAR, and recordkeeping requirements. A 12-month warranty applies, and early/incremental deliveries are accepted and preferred.