FMS; Qty: 2, NIIN: 012238125
This contract requires the repair of assets with a required Repair Turnaround Time (RTAT) of 298.28 days after receipt. The contractor must provide a monthly throughput constraint for each National Stock Number (NSN), with no constraint if a specific monthly volume is met. Assets must be inducted within 365 days after contract award, after which repairs require bilateral agreement. Early and incremental deliveries are accepted and preferred. The location for performance of services is not specified.