FMS; QTY 5: NIIN: 013806511
This contract requires the repair of assets with a contractual Repair Turnaround Time (RTAT) of 82.17 days, measured from physical receipt at the contractor’s facility to government acceptance. The contractor must specify a monthly throughput constraint for each National Stock Number (NSN), with no constraint if throughput is unlimited. Assets must be inducted within 365 days after contract award; repairs after that date require bilateral agreement. Early and incremental deliveries are accepted and preferred. Performance of services is at the contractor’s facility, with no specific budget amount provided.