FMS; Qty 1; 014133910
This contract requires the repair of assets with a turnaround time of 385 days after receipt, measured from physical receipt at the contractor's facility to government acceptance. The contractor must provide a monthly throughput constraint for each National Stock Number (NSN), with no constraint if a specific monthly volume is met. Assets must be inducted within 365 days after contract award, or a bilateral agreement is needed for later repairs. Early and incremental deliveries are accepted and preferred. No specific budget amount or performance location is mentioned in the description.