FMS; Qty 1; NIIN: 014805040
This contract requires the repair of assets within a **Repair Turnaround Time (RTAT) of 302.76 days** after physical receipt at the contractor's facility. The contractor must obtain government final inspection and acceptance for all assets within this RTAT. A monthly throughput constraint must be provided for each National Stock Number (NSN), with no constraint if a specific monthly volume is met. The **Induction Expiration Date is 365 days after contract award**, after which asset receipt requires bilateral agreement with the Contracting Officer. Early and incremental deliveries are accepted and preferred.