16--SRL POWER SUPPLY, IN REPAIR/MODIFICATION OF
The requirement is to repair the SRL Power Supply, NSN 1680-01-618-5503, P/N 2000792-1, in accordance with the latest L3Harris Technologies drawing 2000792-1 and referenced repair manuals/specifications. The contractor must provide facilities, labor, materials, parts, test/tooling equipment, and return the item to Ready for Issue condition at the specified repair source/location: L3Harris Technologies Inc., 1500 New Horizons Blvd, Amityville, NY 11701-1130 (CAGE 82340). Quotes must include either firm-fixed price or TT&E pricing, plus estimated repair costs, under the applicable BOA terms; the SBA has determined that no set-aside applies. The contractor must maintain ISO 9001/SAE AS9100 quality and calibration systems, comply with configuration management, marking, packaging, and enclosed storage requirements, and supply all parts/materials unless Government-furnished. A 365-day warranty applies, with the warranty period measured until 45 days after the last delivery under the contract.