REFUEL CTRL PANEL,C
This opportunity is for the repair/overhaul of a REFUEL CTRL PANEL item to a Ready-for-Issue condition, with the contractor responsible for all parts, labor, and tooling. Repairs must be performed at GE Aviation Systems LLC, 1000 MacArthur Memorial Hwy, Ronkonkoma, NY 11779. The required Repair Turnaround Time is 50 days after receipt of the asset, with an induction expiration date of 365 days after contract award. The contract includes a 365-day warranty on delivered units, and items that are beyond economical repair (BER) or missing components on induction are handled separately. All work must comply with strict quality, inspection, and configuration management requirements, including MIL-STD-130 marking and a government-approved quality system.