FLIGHT MANAGEMENT C
This opportunity is for the repair and overhaul of Flight Management C units (NSN 7RH 1680 016466153 P8) to a Ready for Issue condition, with the contractor responsible for all parts, materials, tooling, and testing. Repairs must be performed at GE Aviation Systems' facility located at 3290 Patterson Ave Southeast, Grand Rapids, MI 49512-1991. The required Repair Turnaround Time (RTAT) is 110 days after receipt of asset, with an induction expiration date of 365 days after contract award, and a warranty of 365 days after delivery. The contractor must maintain ISO 9001/AS9100 quality systems and comply with MIL-STD-130 markings and MIL-STD-2073 packaging. Special provisions apply for Beyond Economic Repair, Missing on Induction, and Over and Above Repair items requiring DCMA/PCO coordination.