BOMB BASE ASSEMBLY
This opportunity is for the repair and overhaul of a Bomb Base Assembly, requiring the contractor to restore items to a Ready for Issue (RFI) condition. The contractor must perform all repairs at its facility in Grand Rapids, MI, and is responsible for supplying all necessary parts, materials, and tooling. A required Repair Turnaround Time (RTAT) of 98 days after asset receipt applies, with an induction expiration of 365 days after contract award. The work includes inspection, component repair/replacement, reassembly, and testing in accordance with specified drawings and standards, with adherence to ISO 9001/SAE AS9100 quality program requirements. No budget amount is specified in this description.