WING STATION CONTRO
This opportunity is for the repair and overhaul of Wing Station Control items to return them to Ready for Issue condition, with work performed in accordance with GE Aviation Systems drawing 185019-001 and MIL-STD-130 markings. The required performance location is GE Aviation Systems LLC, Grand Rapids, MI (CAGE 35351), where the contractor must supply all necessary facility, labor, materials, and test equipment. Required Repair Turnaround Time (RTAT) is 118 days after receipt of asset, with an induction expiration of 365 days after contract award; a warranty of supplies applies for 365 days after delivery. The contractor must provide a monthly throughput constraint per NSN and meet higher-level quality requirements, including ISO 9001/AS9100 and an approved calibration system. Additional conditions cover configuration management, buy American/FTA compliance, and government inspection and acceptance procedures.