RADOME,AIRCRAFT
This is a contract for the repair, overhaul, and testing of specific aircraft radomes (P/N P8ME05611-101) to return them to a Ready for Issue condition. The contractor must perform all work at their own facility, using their own tools, equipment, and materials, as no Government Furnished Property will be provided. Key performance requirements include a 25-day Repair Turnaround Time (RTAT) from asset receipt to acceptance and a defined monthly throughput capacity. The contract includes specific clauses for handling items determined to be Beyond Economical Repair (BER), Missing on Induction (MOI), or requiring Over and Above (OAR) repair.