RADOME

Notice ID:N0038325QT242

This opportunity is for the repair of F/A-18A-D Radomes, with performance expected at the contractor's facility. The required Repair Turnaround Time (RTAT) is 178 days after asset receipt, and the induction expiration date is 365 days after contract award. The contract will be awarded based on best value, evaluating past performance, delivery time, and price. No specific budget amount or performance location outside the contractor's facility is mentioned. The solicitation closing date has been updated multiple times, with the most recent extension noted.

RADOME

Notice ID:N0038325QT242

This opportunity is for the repair of F/A-18A-D Radomes, with a required Repair Turnaround Time (RTAT) of 178 days after asset receipt and an induction expiration date of 365 days after contract award. The contract will be awarded based on best value, evaluating past performance, delivery time, and price. Performance of services will be at the contractor’s facility, and the contractor is responsible for all necessary tooling and test equipment. A First Article inspection will be conducted by a government team, requiring the contractor to contact them at least 30 days in advance. No specific budget amount is provided.

RADOME

Inactive
Notice ID:N0038325QT242

This is a competitive solicitation for the repair, testing, and inspection of F/A-18A-D aircraft radomes in accordance with specific technical manuals. The evaluation factors for award are past performance, time of delivery, and price. The contract requires a Repair Turnaround Time (RTAT) of 178 days from asset receipt to acceptance, with a monthly throughput constraint to be specified by the bidder. The performance location is not specified. The budget is not specified.

RADOME

Notice ID:N0038325QT242

This is a competitive solicitation for the repair, testing, and inspection of F/A-18A-D aircraft radomes in accordance with a detailed Statement of Work and technical manuals. The evaluation factors for award are past performance, time of delivery, and price, with the contract to be awarded based on best value to the government. The contractor must achieve a Repair Turnaround Time (RTAT) of 178 days from physical receipt of the asset at their facility to final government acceptance, and there is a monthly throughput requirement. The contractor is responsible for providing all necessary tooling and equipment, and a First Article inspection will be conducted by a government team at the repair facility with at least 30 days' advance notice required.

RADOME

Inactive
Notice ID:N0038325QT242

CONTACT INFORMATION|4|N791.05|BFC|215-697-0484|christina.foley1@navy.mmil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||||||...

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT
  PSC   AIRFRAME STRUCTURAL COMPONENTS
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »