VACUUM PUMP,AIRCRAF
This is a contract for the repair, testing, and return to service of a specific Vacuum Pump Assembly for aircraft (NSN 6625-01-563-7820, Part Number 740020-1). The contractor must induct, evaluate, fault-isolate, repair, and functionally test each unit, with a required Repair Turnaround Time (RTAT) of 118 days after receipt of the asset at the contractor's facility. The performance location for the repair work is listed as "TBD" (To Be Determined) for both the company name and address. The contract includes an induction expiration date of 365 days after award, after which no further assets can be accepted for repair without a bilateral agreement.