USS O'Kane DDG-77 Removal and Disposal of Fuel
N0024426QS013
This amendment confirms the fuel to be offloaded is microbially contaminated, with specific test results provided. The work must be completed by January 23, 2026, with a preference for the work period to be between January 15 and January 23, 2026, on weekdays from 0700 to 1600. All offloading must occur during daylight hours. The performance location is at a pier, with specific guidance that contractor equipment must fit outside the fire lane boundary on pier 3. The ship is currently boomed for the operation.