Columbia Class Tailcone Follow-on

Notice ID:N0016726R1005

This is a pre-solicitation notice for the engineering and manufacturing of US Navy COLUMBIA Class submarine propulsor tailcones, not a request for proposals. The Naval Surface Warfare Center, Carderock Division, is seeking industry comments on draft documents, with responses limited to ten pages demonstrating capability and identifying barriers. The planned release of the RFP is the end of September 2026, with award anticipated in June 2027. No budget amounts are specified, and the location for performance of services is not mentioned.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NSWC CARDEROCK
  PSC   2010 SHIP AND BOAT PROPULSION COMPONENTS
LOCATION: Not Given
Primary Contact
Abeer Ameer
301-***-4537
Alt Contact
Sam Keith
301-***-2357

Links (0)

Attachments (13)

Document
Size
Access
Updated
(UNCLASS DISTR C)_324561101 REV A_DP2.3.X Tailcone Lifting Insert_A3_PTIsigned_05P3_Signed.pdf
3.8 MB
Controlled
May 14, 2026
(FOUO DISTR D)_ 324561105 REV A_TAILCONE MOUNTING FIXTURE_A3u_PTIsigned_05P3_Signed.pdf
5.71 MB
Controlled
May 14, 2026
(UNCLASS DISTR C)_324561003 REV A_DP2.3.3 TAILCONE FAIRING CAP SPANNER TOOL_A3_PTIsigned_05P3_Signed.pdf
1.98 MB
Controlled
May 14, 2026
(UNCLASS DISTR C)_324561004 REV A_DP2.3.X TAILCONE TORQUE REACTION ROD_A3_PTIsigned_05P3_Signed.pdf
2.53 MB
Controlled
May 14, 2026
(UNCLASS DISTR C)_324561104 REV A_DP2.3.X Tailcone Tapered Bushing_A3_PTIsigned_05P3_Signed.pdf
1.31 MB
Controlled
May 14, 2026
(UNCLASS DISTR C)_324561103 REV A_DP2.3.X Tailcone Center Ring_A3_PTIsigned_05P3_Signed.pdf
1.19 MB
Controlled
May 14, 2026
(UNCLASS DISTR C)_324561102 REV A_DP2.3.X Tailcone Lift Adapters_A3_PTIsigned_05P3_Signed.pdf
1.12 MB
Controlled
May 14, 2026
(UNCLASS DISTR C)_324561005 REV A_DP2.3.X TAILCONE LIFT HOLE FAIRING CAPS_A3_PTIsigned_05P3_Signed.pdf
1.33 MB
Controlled
May 14, 2026
(UNCLASS DISTR C)_324561002 REV A_DP2.3.X TAILCONE ATTACHMENT FAIRING CAP_A3_PTIsigned_05P3_Signed.pdf
1.3 MB
Controlled
May 14, 2026
(UNCLASS DISTR C)_324561001 REV A_DP2.3.X TAILCONE ATTACHMENT FASTENER_A3_PTIsigned_05P3_Signed.pdf
1.27 MB
Controlled
May 14, 2026
(FOUO DISTR D)_324561000 REV A_DP2.3.3-DP2.3.4 TAILCONE KIT_A3_PTIsigned_05P3_Signed.pdf
255.04 KB
Controlled
May 14, 2026
CLB TC Follow-on Sections L and M Synopsis.pdf
283.47 KB
Public
May 14, 2026
CUI CLB TC Follow-on SOW 260318 - Synopsis.pdf
286.01 KB
Public
May 14, 2026


Data sourced from SAM.gov. View Official Posting »