PUMP UNIT,ROTARY
The Navy seeks repair of a rotary pump unit (CAGE 3S0K8, ref. E-4554) under a bilateral award requiring the contractor’s signed acceptance, with a required repair turnaround time of 166 days from asset return to acceptance; accelerated CASREP delivery is encouraged at no extra cost. Quotes must include unit/total price, RTAT or capacity constraints if the 166-day requirement cannot be met, pricing basis if the item was not previously purchased or pricing increased, any beyond-repair testing/evaluation NTE fee, awardee/inspection/shipping CAGEs, and new-unit price/lead time for comparison. The government may add an option quantity at the same unit price, and late RTAT performance will incur a contractor-specified per-unit/per-month price reduction up to a stated maximum. Government source inspection is required, freight is FOB Origin with Navy-handled freight under the CAV SOW, and repair must follow OEM specifications/drawings, MIL-STD-130 marking, MIL-STD-2073 packaging, with records retained 365 calendar days after final delivery. If additive manufacturing is used, a master component traceability ledger and related CDRL reporting are required; only authorized distributors of the original manufacturer’s item will be considered.